Skip to Workflow Atlas
ETL PipelineIntermediate

Qualys Report Automation to TheHive

Qualys Report Automation to TheHive is a 15-node automation blueprint connecting Qualys API, TheHive API, n8n internal operations. Inspect its trigger, execution graph, branches, and implementation requirements.

Interactive system map

Follow the runtime. Inspect what supports it.

Solid horizontal paths show main-channel execution. Violet dependencies sit beneath the exact step they configure or empower.

15

Nodes

16

Links

1

Run groups

Connected tools

3 integrations

  • Qualys API
  • TheHive API
  • n8n internal operations

Canvas controls

Fit wide systems, then zoom into any run group.

Qualys Report Automation to TheHive execution lanes1 run groups containing 15 workflow nodes and 16 visible links. Solid horizontal lines are main-channel runtime links. Violet dashed lines connect typed dependencies beneath the runtime step they support. Focus any node to inspect its immediate path.When clicking "Test workflow". trigger node, manualTrigger. 0 incoming and 1 outgoing connections.STARTWhen clicking "Test workf…TRIGGERMANUALTRIGGER0 IN / 1 OUTSchedule Trigger. trigger node, scheduleTrigger. 0 incoming and 1 outgoing connections.STARTSchedule TriggerTRIGGERSCHEDULETRIGGER0 IN / 1 OUTGlobal Variables. transform node, set. 2 incoming and 1 outgoing connections.STEP 02Global VariablesTRANSFORMSET2 IN / 1 OUTGet Last Timestamp. integration node, executeWorkflow. 1 incoming and 1 outgoing connections.STEP 03Get Last TimestampINTEGRATIONEXECUTEWORKFLOW1 IN / 1 OUTFetch Reports from Qualys. integration node, httpRequest. 1 incoming and 1 outgoing connections.STEP 04Fetch Reports from QualysINTEGRATIONHTTPREQUEST1 IN / 1 OUTXML. integration node, xml. 1 incoming and 1 outgoing connections.STEP 05XMLINTEGRATIONXML1 IN / 1 OUTSplit Out. transform node, splitOut. 1 incoming and 1 outgoing connections.STEP 06Split OutTRANSFORMSPLITOUT1 IN / 1 OUTRemove Already Processed Reports. decision node, filter. 1 incoming and 1 outgoing connections.STEP 07Remove Already Processed …DECISIONFILTER1 IN / 1 OUTAny Reports to Process?. decision node, if. 1 incoming and 2 outgoing connections.STEP 08Any Reports to Process?DECISIONIF1 IN / 2 OUTLoop Over Items. integration node, splitInBatches. 2 incoming and 2 outgoing connections.STEP 09Loop Over ItemsINTEGRATIONSPLITINBATCHES2 IN / 2 OUTUpdate Timestamp. integration node, n8n. 2 incoming and 0 outgoing connections.STEP 10Update TimestampINTEGRATIONN8N2 IN / 0 OUTWait. integration node, wait. 1 incoming and 1 outgoing connections.STEP 11WaitINTEGRATIONWAIT1 IN / 1 OUTCreate Case. integration node, theHiveProject. 1 incoming and 1 outgoing connections.STEP 12Create CaseINTEGRATIONTHEHIVEPROJECT1 IN / 1 OUTDownload Report. integration node, httpRequest. 1 incoming and 1 outgoing connections.STEP 13Download ReportINTEGRATIONHTTPREQUEST1 IN / 1 OUTAdd Report As Attachment. integration node, theHiveProject. 1 incoming and 1 outgoing connections.OUTCOMEAdd Report As AttachmentINTEGRATIONTHEHIVEPROJECT1 IN / 1 OUT

Signal inspector

Focus, hover, or select a step to isolate its runtime and support links.

Main-channel runtimeTyped dependencytriggeraidecisiontransformintegration
Scroll horizontally to follow every connected flow.15 connected nodesEnter or click to lock · Escape to clear

Runtime breakdown

Read the execution spine before its dependencies.

Each run group separates main-channel steps from the models, tools, retrievers, and data services that support them. Start and outcome labels apply only to runtime nodes.

01

Run Group

When clicking "Test workflow"

16 Execution Links
  1. Start

    When clicking "Test workflow"

    Trigger

    Schedule Trigger

    Trigger

  2. Step 2

    Global Variables

    Transform

  3. Step 3

    Get Last Timestamp

    Integration

  4. Step 4

    Fetch Reports from Qualys

    Integration

  5. Step 5

    XML

    Integration

  6. Step 6

    Split Out

    Transform

  7. Step 7

    Remove Already Processed Reports

    Decision

  8. Step 8

    Any Reports to Process?

    Decision

  9. Step 9

    Loop Over Items

    Integration

  10. Step 10

    Update Timestamp

    Integration

  11. Step 11

    Wait

    Integration

  12. Step 12

    Create Case

    Integration

  13. Step 13

    Download Report

    Integration

  14. Outcome

    Add Report As Attachment

    Integration

Turn the map into a plan

Adapt this blueprint to your company.

Bring the system shape into a workspace, then define the production controls, data boundaries, owners, and delivery sequence around your context.